Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
Gaming-software-info@adjamemarche.com
千亿体育娱乐
买球网站
蒙阴网
Shibo-Sports-support@zurroundgame.com
康泽药业
The-Venetian-Macao-app-info@ericasoaresfotografia.com
赌博软件
银河娱乐app
全网数商
搜刮音乐平台
迁安生活网
易流GPS
香港美心西饼
古城香业
金鹰卡通卫视官网
DJ330舞曲网
华夏航空
酷走旅游网